Use

Mark clearance conflicts

Annotate the beam a pipe would cut through — before it cuts through.

Mark the exact location of a clearance conflict — beam vs pipe, duct vs joist, panel vs stud, ceiling vs equipment. Photo-annotate at true scale. Send the marked capture to the architect, engineer, or trade for a decision without leaving the site.